The Regatta Bar: Manufacture & Installation

St Michael’s Hotel, Falmouth


A beautiful design that needed manufacture & installation

St. Michael’s Hotel & Spa is one of the finest hospitality businesses in Falmouth. It’s also one of the busiest, with a full diary of events and rooms at capacity throughout the year. With less than two weeks between wedding bookings, the hotel hired RRW to make and fit a top-of-the-line bar in their Regatta Suite.

A 9 day installation timeline

Designed by 20/20 Projects . St Micheals Hotel’s needed a shopfitting partner who could install the whole bar inside an incredibly tight 9-day time frame. We knew that we could handle the manufacture and install work, but we’d never worked to such a tight timescale before. We couldn’t overrun, even by a day.

A first-rate result for an award-winning hotel

RRW took full responsibility for the job and managed the whole project from manufacture to completion. We worked to a watertight schedule, liaising with the clients and with third party electrical and plumbing contractors to get the job done between the hotel’s valuable wedding bookings.

As with any project, there were a number of unforeseen obstacles, which — thanks to our meticulous planning — we were able to handle. It was a tough nine days, but we came away very happy with the end result.



Materials Used:

  • MR MDF for the carcassing
  • Acid curing Sherwin Williams paint system ( counter front)
  • Solid American Oak ( bulkhead , goal post structure and lippings)
  • Hanex Solid surface – Worktops
  • Acrylic back bar lightboxes
  • Glass Shelving
  • Mirror Backsplash
  • Ceramic tiles
  • LED strip lighting